Spraybooths
Unitech Machinery re-skinned two existing Burntwood primer booths (18m and 24m) at Dennis Eagle’s Warwick facility and replaced all booth lighting with new LED fittings,
The project centred on transforming Terex Campsie’s existing concrete room in Ireland into a fully operational semi-downdraft dry filter spray booth, maximising the value of
The project centred on delivering a cost-effective single skin dry filter booth that integrated seamlessly with Stormking’s existing rear extraction infrastructure.
Unitech Machinery was commissioned by Mec-A-Tec to deliver a complex water wash spray booth installation and finishing solution for their new production facility.